STRABAG UK provides full construction services, from design and planning to commissioning and operations, to major infrastructure schemes and complex ground engineering projects. 

STRABAG UK are the contractors responsible for the tunnel construction on the Anglo American Woodsmith Project, which is the development of a state-of-the-art polyhalite fertiliser mine based two miles south of Whitby in the North York Moors National Park. It will set new standards for sustainable mining while helping to boost food production and sustainable farming practices.

For this project, our Cleveland Modular team supplied a large 28 bay single storey facility that houses the engineering team. The building serves multiples purposes and features office, canteen, and drying areas, as well as toilet and shower facilities.

Positioned alongside the 28 bay office building, sits a smaller 3 bay single storey building used solely by the emergency response team as a base to monitor work within the mine and for the quick deployment of staff and equipment in the event of an incident.

Multiple ancillary items were supplied as part of our ‘Boost Your Space’ service, providing both structures with the following:

  • Fire alarm
  • Emergency lighting
  • Air conditioning
  • Dehumidifiers to drying rooms
  • IT installation/provision

All units were painted RAL6008 (Sherwood Green) to comply with local planning requirements, along with black out windows as the site overlooks a caravan park.

Cleveland Modular provided an innovative solution which fulfilled our requirements. Prices were competitive, quality was great, and the excellent customer service was even better. Their team is responsive, knowledgeable and pro-active. They were a pleasure to work with throughout the process.

Together we have created a spacious canteen, shower area, and drying room as well as a professional office space and conference room for planning and coordination of our works.

Overall, we experienced a friendly, personable service which took the stress out of designing and delivering our accommodation units. The final product is top quality and meets all our needs.

Callum Fryer, Construction Manager at STRABAG AG - UK Branch

By providing a large single-story building and a small emergency response base, Cleveland Modular has ensured that STRABAG UK’s engineering and safety teams have the optimal environment to carry out their crucial work.

The facilities not only comply with local planning requirements but also support the project's commitment to innovation and sustainable practices. The positive feedback from STRABAG UK underscores the success of this partnership, highlighting the seamless service, competitive pricing, and high-quality solutions delivered by Cleveland Modular.

By meeting the unique demands of this ambitious infrastructure development and addressing complex construction needs, Cleveland Modular reinforces its reputation as a trusted partner in delivering exceptional site solutions.